Saturday, November 14, 2020

Bulkheads

 Building the Bulkheads

All bulkheads have been cut out, and framing has been installed on them.

Bulkhead #9; This is the widest part of the Blobster at 72 inches.


Bow transom


Bulkhead #2


Emma inspects the work


Next step

Apply a coat of epoxy on all bulkheads.

No comments:

Post a Comment

Atypical's Maiden Voyage

Maiden Voyage. It's a great day. I launched Atypical at Sardis Lake. Not much wind, but I was elated that it floated and there were no l...