Maiden Voyage. It's a great day. I launched Atypical at Sardis Lake. Not much wind, but I was elated that it floated and there were no leaks. Motored out and then raised the sail. Finally got a small but steady breeze and tacked up wind about three miles, then downwind back to the ramp. Stayed out on the water about 4 hours. I'm very pleased with the boat's performance. It feels big and safe.
Wednesday, May 4, 2022
Saturday, April 16, 2022
What's' in a Name?
Got the outboard in today - 4hp Tohatsu, and named her - Atypical.
Tuesday, April 5, 2022
Raising the Sail
Sail is Up
I spent today setting up the mast, raising the sail, attaching the downhall and the mainsheet. I will have to do some adjusting and trimming as time goes on. A state officer came and inspected the boat. He gave it a serial number which I must apply. I applied to the state for an official registration number. I'm happy!!!! It's done and will soon be on the water.
Thursday, March 3, 2022
Odds and Ends
There are lots of little things to finish near the end of construction. Below are some photos of the rudder and of the tarp cabin opening cover.
PVC pipe braces for roof tarp
After setting up the mast I will probably alter the tarp roof cover so it may be used with the mast up.
Next steps:
I still have to step up the mast, lace the sail to the yard and boom, attach the leeboard, get the boat inspected for registration, and go sailing.
Sunday, January 23, 2022
On the Trailer
Loaded on the Trailer
I was able to load the Blobster on the trailer single handedly with the help of a pulley system I installed in the shed. I made the carpet covered bunks and installed them on the trailer. I also made the doors for the bow and each end of the cabin. I thought finishing them in the natural was a nice touch.
Next steps:
I have yet to attach the leeboard. It will require some epoxy work inside, so I'll have to wait for warmer weather. I also need to make a cover for the cabin top opening which will snap on. When it warms up I'll pull it outside and set up the mast and the sail.
Saturday, October 30, 2021
Final Steps:
I've been applying trim moldings around the front and rear doors to the cabin and painting and finishing the topsides.
I've been contemplating the mast step and have a plan. I'll be installing it if the weather will cooperate. I still need to install the floor in the bow compartment and in the cabin.
Thursday, October 14, 2021
Moving On
Leeboard Brackets, moldings, & Such
I got the leeboard brackets mounted after much measuring and contemplation. Other than that I have finished attaching the moldings. All these final things take time, but it's nearing completion.
Cardboard template of the leeboard was a great help.
Thursday, September 23, 2021
Cabin Floor and Gunwale Moldings
Cutting the Cabin Floor:
I used the last piece of plywood today to make the forward sections of the cabin floor.
Making cardboard templates saves plywood
Second layer of white oak gunwale moldings attached
Next Steps:
Install the mast step, cabin top and floor.
Friday, September 17, 2021
Nearing the End
Cockpit painted; framing for cabin floor almost complete. Cabin roof panels cut and dry fitted.
Next Steps
Complete framing and cutting out cabin floor, secure the cabin roof, work on the mast step.
Monday, August 30, 2021
Interior Framing Continues
Framing Continues:
I have completed the framing in the cockpit and the motor well, and I have moved on to the cabin floor framing. Rather than water ballast I elected to go with Wake Ballast steel shot bags, so the ballast compartments will receive additional reinforcement. I can see the light at the end of the tunnel, and it's a beautiful sight.
Sunday, August 1, 2021
Interior Framing
Interior Framing and Decking
I have completed most of the fiberglass taping of the interior joints. I am now doing the framing and decking of the interior. I'm working on the cockpit today. The framing for the cockpit seats is completed, and the panels for the sides of the footwell have been dry-fitted in place.
Cockpit
Friday, July 16, 2021
Taping Inside Joints
Taping Inside the Hull
Now that the hull has been turned over I have been filling and taping the interior surfaces of the plywood joints with two layers of fiberglass tape. It's not a fun job but a very important one. I'll be glad to get started on the interior carpentry.
Apply coats of epoxy to interior surfaces, prime interior surfaces, finish sanding, priming, and painting exterior topsides.
Thursday, July 1, 2021
Turning the Hull
Turning the Hull Over
Using a system of pulleys I rigged in the shed I was able to turn the hull over without help. It's nice to see the inside of the boat in the upright position.
Tape and epoxy joints on the inside of the hull
Atypical's Maiden Voyage
Maiden Voyage. It's a great day. I launched Atypical at Sardis Lake. Not much wind, but I was elated that it floated and there were no l...
-
Sail is Up I spent today setting up the mast, raising the sail, attaching the downhall and the mainsheet. I will have to do some adjusting a...
-
Maiden Voyage. It's a great day. I launched Atypical at Sardis Lake. Not much wind, but I was elated that it floated and there were no l...
-
I've been applying trim moldings around the front and rear doors to the cabin and painting and finishing the topsides. Next Steps: I...